---
title: "Google API \"Too Many Requests\" Error in wpDataTables"
description: "Understanding the cause and solutions for exceeding Google Sheets API quota limits."
url: https://help.wpdatatables.com/en/articles/12-google-api-too-many-requests-error-in-wpdatatables
collection: "Technical issues"
updated: 2026-10-21
language: en
---

# Google API "Too Many Requests" Error in wpDataTables

Understanding the cause and solutions for exceeding Google Sheets API quota limits.

If you encounter the error **“Too many requests”** when loading tables linked from Google Sheets, this means the **Google API request limit has been exceeded**.

#### 💡 Why does this happen?

For example, when our [**Auto Update Cache**](https://wpdatatables.com/documentation/table-features/caching-data-and-auto-update-cache-in-wordpress-tables) option is enabled and you're using the **Google Sheets API** method, the plugin makes a couple of API calls each time a scheduled cron job runs — one for each linked table.

This is done to retrieve the latest data from the connected spreadsheet.

If you have a large number of tables linked via Google Sheets, these repeated API calls can quickly exceed Google’s quota limits, resulting in the “Too Many Requests” error.

📌 You can find more details explained about Google’s API [quota here](https://developers.google.com/sheets/api/limits).

* * *

## ✅ Possible Solutions

#### 1\. **Remove your Google service account from the plugin settings:**

-   Go to **Main Settings > Google Spreadsheet API settings**, and remove your service account credentials.  
    
    ![](https://staticfiles.gleap.io/ghelparticle/ObJPRBobPuIGGKPFrbqpJ3i6HTvimMAb8oIHWA5cAoBirFDPPzsyqiK77mfTdMqMvhKEVJ4kY88.webp)
    
    -   After doing this, you’ll still be able to link existing or new tables without using the Google API, following the instructions in this [**documentation**](https://wpdatatables.com/documentation/creating-wpdatatables/creating-wpdatatables-from-google-spreadsheets/)**.**
        
        By default, this method relies on Google’s built-in caching, which automatically refreshes the table approximately every 15 minutes when the source Sheet is edited.
        
        If needed, you can still use our plugin’s [Cache and Auto Update Cache](https://wpdatatables.com/documentation/table-features/caching-data-and-auto-update-cache-in-wordpress-tables) feature to set a **custom refresh interval** using a cron job.
        
        The only downside to this method is that you **won’t be able to use private Google Sheets** — only published Sheets can be linked without the API.
        

* * *

#### 2\. **Request a Google API quota increase:**

-   Google allows you to request a quota increase for your project.
    
-   However, this may incur additional costs depending on your usage.
    
-   More information is available under the **“Request a quota increase”** section on Google’s official [documentation](https://developers.google.com/workspace/sheets/api/limits).
    

![](https://staticfiles.gleap.io/ghelparticle/PV5DhyIlumGl24V7zSd25E6syVaCa19wPNU2DKcPahHKbddNFhZidexV0KAwJxObucZkn6vii98.png)

* * *

#### 3\. **Disable the “Auto Update Cache” option in the table settings:**

-   If your source spreadsheets **aren’t updated frequently**, this might be the simplest solution.
    
-   With Auto Update Cache turned off, you can manually refresh data by opening the table in the back-end and clicking **"Save Changes"** after making any edits to the Sheet.
    
-   Note: If you manage many tables that require regular updates, manual refreshing may not be practical.
